How long will the feasibility study take?
The in-depth analysis of the current condition of the school, as outlined in response to the above question, will take approximately 6-9 months. Upon completion of the first phase, the SBC, OPM and Designer Architect will work with the MSBA on determining the long-term solution for the school. The second phase of the study will include the conceptual and schematic designs and drawings for the solution selected and will take an additional 6 to 12 months. The total length of time for the study is 12-24 months.