
Quick Facts
- Essex Elementary School was built in 1957, with an addition in 1975 that included the library and gymnasium. The existing building totals 55,600 sf and has reached the end of its useful life, with major systems needing replacement, including the roof, windows, heating and ventilation, and electrical systems. More details on the existing conditions can be found in the District’s 2023 Statement of Interest and the 2023 Habeeb facilities assessment report.
- This is the third building project in the long-term capital plan established when the regional school district was formed. The plan was to address each school building in order of greatest need, beginning with the Middle High School, followed by Manchester Memorial. The Essex Elementary School project will complete that long-term vision.
- The proposed new Essex Elementary School will serve PreK through grade 5, with modern classrooms, spaces for art, music and physical education, and improved outdoor play areas. The project will also provide updated building systems, full accessibility, and safer traffic flow for student drop-off and pick-up, with an anticipated building lifespan of 50–75 years.
- The cost of rebuilding Essex Elementary School will be $95.3 million, with an anticipated $20.9 million contribution to the funding coming from the Massachusetts School Building Authority and the remaining $74.4 million coming from the two towns, split according to the regional agreement, approximately two-thirds to Manchester-by-the-Sea and one-third to Essex.
- Approval for construction requires two key votes: a two-thirds majority at both Manchester and Essex Fall Town Meetings on November 16, 2026. If approved, a majority ballot vote in each town is required on December 10, 2026, for the debt exclusion.
- Project Videos