Since beginning the feasibility phase in December 2024, the School Building Committee has developed the recommended design to replace Essex Elementary School through a review of educational needs, building conditions, costs, and community input.
The Committee evaluated renovation, renovation/addition, and new construction, considering how each option would support the educational program, address building and site conditions, affect school operations during construction, and provide long-term value.
The Committee unanimously selected the preferred new construction design as the most cost-effective solution to meet the school’s educational and operational needs over the long term. MSBA approved advancing that solution to schematic design on June 24, 2026.
The district’s educational program guided the design, with MSBA’s space guidelines and design enrollment informing the space plan. These guidelines address the school’s overall size and the size and number of instructional, administrative, and support spaces, including classrooms, special education rooms, small-group rooms, art and music rooms, the gym, media center, and cafeteria.
The design supports the educational program through:
- Learning neighborhoods that bring together classrooms and small-group spaces to support whole-class instruction, intervention, and flexible grouping.
- Specialized spaces that support special education services.
- Preschool classrooms fulfill the district’s plan (and potential future state mandate) to provide town-based Pre-K in both communities. During the Memorial project, the district chose to build two preschool classrooms there and defer the other two until the Essex building project.
- Dedicated spaces support art, music, and physical education.
The gym, library media center, field, cafeteria, and other designated areas also serve community uses outside school hours. The goal is comparable educational opportunities to Memorial, at a scale suited to Essex.
Throughout the design process, SBC assessed design recommendations for cost effectiveness and whether they met the requirements of the education program. The SBC also considered both operational and maintenance costs over time.
- It incorporates all-electric, efficient heating and cooling systems and an insulated building envelope designed to meet applicable Specialized Stretch Energy Code requirements. These features help manage energy use and provide consistent indoor conditions.
- Mechanical systems were evaluated for life-cycle costs.
- Building materials and finishes were reviewed for durability, maintenance needs, and replacement costs. The result is a building that can withstand daily school use and be maintained efficiently over its useful life.
Cost responsibility has been part of each stage. The team reviewed building area, layout, materials, systems, and site improvements for savings. The Committee accepted approximately $3.6 million in reductions after the initial estimate in Fall 2026. This is already reflected in the current $95.35 million project budget.
The approach balances initial construction cost with long-term operating and maintenance needs, providing a school that meets the needs of today’s learners and can serve future generations.
Could the design be changed further?
SBC, made up of professionals from both communities with relevant professional experience, voted to approve the construction of a new building on this site with this design because of its alignment with the educational program that MERSD delivers. The team has continued to refine the design within that framework. Changes that alter the preferred solution or no longer support the approved educational plan would require returning to feasibility and seeking renewed approval. This would delay the project and add construction escalation, design, and OPM costs that could offset proposed savings.
Watch: Essex Building Project Overview